November 11, 2008 Presentation
On November 11, 2008 a team of City of Hollywood staff gave a presentation of their plans for the revitalization
of Hollywood Boulevard from Presidential Circle to the Turnpike.
Presentation by Daniel Smith
At the November 5, 2008 City Commission meeting, Daniel Smith, Project Manager for FDOT, gave a presentation which
provided a status update regarding the proposed intelligent transportation systems project providing for message board
installations in the vicinity of 95 major roadway corridors of the City of Hollywood.
|
 |
R-2008-283
A resolution authorizing the appropriate City Officials to Execute the Attached Maintenance Agreement Between the
Florida Department of Transportation (FDOT) and the City of Hollywood to maintain Proposed Landscape Enhancements within
Hollywood Boulevard Corridor from Young Circle to the Intracoastal Waterway as part of Florida Department of
Transportation’s Hollywood Boulevard Improvement Project.
|
 |
City Commission Meeting Video - Sept 3, 2008
On September 3, 2008 a team of City of Hollywood staff gave a presentation of their plans for the revitalization of
Hollywood Boulevard from Presidential Circle to the Turnpike. Click here to view a PDF of the presentation. |
 |
The Radius
This residential, mixed-use project was completed in 2008. The Radius has 311 residences and 36,000 square feet of first class
retail and office space.
Hollywood Station
This residential mixed-use project was completed in 2007. Hollywood Station has 93 loft residences and 20,000 square feet of
retail space.
ArtsPark at Young Circle
The ArtsPark at Young Circle is located in the heart of historic Downtown Hollywood at Hollywood Boulevard and Federal Highway.
I-95 to Presidential Circle
This project is currently underway and includes median revisions, a pedestrian crossing signal west of the Tri-Rail station, ADA sidewalk and intersection ramp improvements, drainage and pavement restoration and resurfacing. The construction budget is $8.4 M and work is on schedule for a November, 2009 completion.
Presidential Circle to State Road 7/US 441
This project is currently under design with a scheduled contract award for January, 2011. The project represents a partnership between FDOT, the Broward County MPO and the City of Hollywood which combines the resources of the State’s $4.4 M roadway resurfacing project, with the City’s $1.2 M MPO Safety Grant to include a landscaped safety median from Presidential Circle to State Road 7/US 441. Landscape contributions from FDOT, together with the cost savings achieved through the consolidation of these projects will facilitate the addition of median and shoulder landscape enhancements throughout the corridor.
US 1 to A1A
This $5.8 M project combines a programmed pavement restoration and resurfacing effort with a corridor safety project to include intersection improvements at 13th Avenue, drainage improvements throughout the corridor, and landscaped safety medians for the project limits. Design elements and construction documents have been completed and the project is in the bidding phase with construction to commence in August, 2009.
|
Business Development on Hollywood Boulevard
 Before
|
McDonald's
5835 Hollywood Boulevard
Investment Amount: $500,000
Renovation Begin Date: October 2007
Renovation Completion Date:
The existing McDonald's was demolished and a new 3,863 sq. ft restaurant complete with a drive thru was built.
|
 After
|
| |
 Before
|
Community Bank
4600 Hollywood Boulevard
Investment Amount: $75,000
Project Begin Date: 11/07
Project Completion Date:
|
 After
|
| |
 Before
|
Washington Mutual
4223 Hollywood Boulevard
Investment Amount:
Project Begin Date:
Project Completion Date:
The Washington Mutual was built on the rear parking lot of 4223 Hollywood Boulevard
|
 After
|
| |
 Before
|
Bright Star Credit Union
4743 Hollywood Boulevard
Investment Amount: $800,000
Renovation Begin Date:
Bright Start Credit Union will receive a new addition to the existing building.
|
 After
|
| |
 Before
|
Shell Gas Station
4550 Hollywood Boulevard
Investment Amount:
Project Begin Date:
Project Completion Date:
This 2,200 sq. ft. property vacant since 2005 will be renovated into a gas station which will include four, two-sided fuel pumps.
|
 After
|
 |
|
Resources
Contact Us
Have questions? Send us an email and we will be sure to answer.
Subscribe to mailing list
Sign up to receive information about upcoming meetings, workshops and other helpful information.
Frequently Asked Questions (coming soon)
|
|
| |
| |
State Road 7/441 | Hollywood Blvd | US 1
Dixie Hwy | Business and International Trade
|
|
|
|
|
|
|